top of page

Civils Engineering & Utility Services

Trial Holes

  • Trial hole excavations

  • Investigate the composition and structure of the subsurface before undertaking further major work

 

Maintenance Excavation

  • Maintenance excavations eg: split-couplings and sunken jointing chambers

Duct Blockage Clearance

  • Excavate to expose and repair damaged duc

 

Cabinet Capacity Upgrades & Reshell

  • Upgrade capacity of streetside telecommunications cabinets

  • Upgrade cabinet shell

  • Re-shelling existing cabinets

  • Fitting side-pod extensions to existing cabinets

  • Eg: Stand-off and G.fast side pods to existing PCP cabinets and HD side pods to DSLAM cabinet

 

High Pressure Water Jetting

  • High pressure water jetting to clear silt build up within the underground duct network

Gully Emptying & De-siltin

  • Remove and dispose of waste water from jointing chambers and manholes with jet vac tankers

  • Utilise licensed waste sites in accordance with current legislation

Screenshot 2023-04-28 at 12.16.40.png

Call 

0800-689-1676

Email 

Follow

  • Facebook
  • Twitter
  • LinkedIn
  • Instagram
bottom of page